A holiday park outside Norwich was adding EV charging across its lodge accommodation to meet rising guest demand. Twelve chargers in total: ten 7kW lodge-side and two 50kW rapid units at the central reception area.

The park stayed open throughout the works — guest experience was the headline constraint.

What the job involved

  • Sub-mains from the park's existing distribution to each lodge cluster.
  • 180m of LV cable pulled across both grass and tarmac sections.
  • Two 50kW rapid charger feeders run to the reception car park.
  • Lodge-side terminations into existing meter cabinets with new MCB protection.
  • Reinstatement to mixed grass / tarmac surfaces with no visible scarring.

Key challenges

  • Park operational throughout — only one access road for plant.
  • Lodge guests changing every Friday — works scheduled to avoid changeover days.
  • Buried foul drainage routes had to be carefully avoided in two locations.

Outcome

  • All twelve chargers live before the Easter peak.
  • Zero guest complaints across the four-week install.
  • Operator engaged us for sister sites in Suffolk and Lincolnshire.

Holiday park guests notice everything. They didn't notice us, and that's exactly what we wanted.

— Park Manager, Norwich, Norfolk